Arlington Elite Asphalt provides asphalt milling (cold planing) for commercial parking lots, private roads, and large driveways throughout Northern Virginia. Milling removes a precise 1–3 inch layer of the existing asphalt surface using a drum-equipped milling machine, leaving a clean, textured base for a new hot-mix overlay — without raising the grade at curbs, drainage inlets, or garage aprons.
Asphalt milling runs $1.50–$3 per sq ft for the milling operation alone; full mill-and-pave projects are priced as a combined scope. Millings are typically recycled as RAP (reclaimed asphalt pavement) — a cost-effective and environmentally responsible material cycle.
Arlington Elite Asphalt uses grade-controlled milling equipment that removes the failed surface layer precisely — critical for maintaining proper drainage slopes and grade relationships at curbs, gutters, and garage door thresholds.

Typical pricing for Northern Virginia. All estimates are free and provided after an on-site visit.
| Job Type | Typical Cost | Notes |
|---|---|---|
| Small lot milling (under 5,000 sq ft) | $1.75–$3.50/sq ft | Mobilization adds to cost on small jobs |
| Medium lot milling (5,000–20,000 sq ft) | $1.50–$2.75/sq ft | Volume pricing improves above 10,000 sq ft |
| Large lot / road milling (20,000+ sq ft) | $1.25–$2.25/sq ft | Best cost-per-sq-ft range |
| Mill-and-pave combined project | Call for quote | Single-contractor, single-mobilization |
| Haul millings off-site (per load) | $250–$450 | Can be used as RAP or road base |
| Edge milling at curbs/thresholds | $3–$6/LF | Precision milling along fixed edges |
We visit your property within 24–48 hours of your call, assess existing conditions, measure the scope, and give you a written itemized quote. No phone ballparks — we need to see the site to quote accurately and honestly.
Once you approve the quote, we schedule your job and handle any permit coordination. Most jobs are scheduled within 1–2 weeks. Commercial and HOA jobs can often be scheduled for overnight or weekend starts to minimize disruption.
Our crew arrives at the agreed time and completes the work with our own employees — no subcontracting. Most jobs are completed the same day. You receive a status update if anything changes the timeline.
Site cleanup before departure — all debris, equipment, and materials removed. Written aftercare instructions left at the job. We are available by phone after completion if you have questions about the surface or ongoing maintenance.
Arlington Elite Asphalt gives you an honest assessment — we never recommend the more expensive option when the simpler one will do.
Not sure if you need service now or can wait? These are the signs that indicate it's time to call Arlington Elite Asphalt at 571-427-0191.
If previous overlay work has raised the asphalt surface to the point where it no longer drains properly to catch basins, or where it sits above adjacent curb height, milling is required before any new paving. Simply adding another overlay layer compounds the problem. Cold-plane milling removes exactly the depth needed to restore correct surface-to-drain relationships and create proper drainage slope.
Commercial lots and heavily overlaid driveways sometimes have 3–4 inches of stacked overlay on top of original paving. This creates poor bonding between layers and surface delamination. Milling removes the failed upper layers to a structurally sound base, providing a proper bonding surface for new asphalt without the destabilizing effect of excessive overlay height.
Parking garage entries, covered drive-throughs, storefront thresholds, and driveway apron connections to public streets often have strict height tolerances. Milling is the only way to lower the surface before repaving — it removes material to specification so the new overlay matches the required finished surface height exactly.
Milled asphalt (reclaimed asphalt pavement, or RAP) is 100% recyclable and can be incorporated into new asphalt mixes at 20–30% content. When you choose milling over full-depth removal and disposal, you reduce both waste disposal costs and new material costs. Arlington Elite Asphalt transfers milled material to asphalt recycling facilities — nothing goes to landfill.