Arlington Elite Asphalt builds and maintains commercial asphalt surfaces for office parks, retail centers, industrial facilities, apartment complexes, and HOA communities throughout Arlington County and Northern Virginia. Commercial paving requires heavier spec than residential: 3–4 inches of compacted asphalt over a 6–8 inch aggregate base, with ADA-compliant layout and drainage engineered for the specific use case.
Commercial parking lot installation runs $2.50–$6 per sq ft for standard passenger vehicle use; heavy truck/loading dock areas run $4–$9/sq ft. We handle all permit coordination — Arlington County DES, Fairfax County, and Virginia state permits as applicable.
Arlington Elite Asphalt handles all phases of commercial paving — from permit coordination and drainage design coordination to installation, striping, and maintenance contracts. We work around your business schedule so parking stays available.

Typical pricing for Northern Virginia. All estimates are free and provided after an on-site visit.
| Service | Typical Cost | Notes |
|---|---|---|
| New parking lot — standard (per sq ft) | $2.50–$5 | Passenger vehicles; ADA included |
| New parking lot — heavy use (per sq ft) | $4–$9 | Truck traffic, loading docks |
| Parking lot resurfacing (per sq ft) | $1.50–$3.50 | Overlay over sound base |
| Milling + resurfacing (per sq ft) | $3–$6 | Mill-and-pave combined |
| Annual maintenance contract | Call for quote | Crack fill + seal + stripe program |
| Stormwater coordination | Included in large lots | Required for significant impervious change |
We visit your property within 24–48 hours of your call, assess existing conditions, measure the scope, and give you a written itemized quote. No phone ballparks — we need to see the site to quote accurately and honestly.
Once you approve the quote, we schedule your job and handle any permit coordination. Most jobs are scheduled within 1–2 weeks. Commercial and HOA jobs can often be scheduled for overnight or weekend starts to minimize disruption.
Our crew arrives at the agreed time and completes the work with our own employees — no subcontracting. Most jobs are completed the same day. You receive a status update if anything changes the timeline.
Site cleanup before departure — all debris, equipment, and materials removed. Written aftercare instructions left at the job. We are available by phone after completion if you have questions about the surface or ongoing maintenance.
Arlington Elite Asphalt gives you an honest assessment — we never recommend the more expensive option when the simpler one will do.
Not sure if you need service now or can wait? These are the signs that indicate it's time to call Arlington Elite Asphalt at 571-427-0191.
When your parking lot shows visible network cracking from the street or your building entrance, it signals to customers and tenants that maintenance has been deferred. Beyond aesthetics, widespread cracking means water infiltration is actively degrading the base on every rain event. Commercial property managers who defer maintenance past this stage typically face a full reconstruction bill within 2–3 years rather than the much cheaper resurfacing that would have been appropriate a year earlier.
Virginia enforces 2010 ADA Standards on commercial parking areas. Common compliance failures in older lots include: insufficient accessible space count, incorrect dimensions, under-width access aisles, excess cross-slope in accessible spaces, and non-compliant or missing signage. A paving project is the right time to bring your lot to full compliance — combining ADA upgrades with resurfacing minimizes disruption and total cost.
For retail, office, and multi-tenant commercial properties, the parking lot is the first impression. Customer complaints about potholes, rough surfaces, or faded markings are a direct signal that deferred maintenance is affecting your tenants' business performance. At the commercial level, lot condition is a retention issue as much as a maintenance issue.
Commercial parking lots without a regular maintenance program — sealcoating every 3–5 years, crack sealing as needed, pothole repair promptly — deteriorate much faster than maintained lots. A lot at 10 years with zero maintenance may already need full reconstruction; a lot at 10 years with regular maintenance may only need sealcoating. We assess actual condition and give you a written recommendation based on what we find.