Arlington Elite Asphalt provides new construction asphalt paving for homebuilders, developers, and general contractors throughout Arlington County and Northern Virginia. We coordinate with your build schedule to install driveways, access roads, and parking lot paving at the correct phase of construction — typically after rough grading and utilities are complete but before final landscaping.
New construction driveway paving runs $7–$15 per sq ft for residential and $2.50–$6 per sq ft for commercial lots. We issue certificates of substantial completion and coordinate inspections with Arlington County, Fairfax County, and VDOT as required for your permits.
Arlington Elite Asphalt has extensive experience working alongside builders and GCs on new residential and commercial construction projects — we understand phased scheduling, utility conflicts, and the permit coordination required in Northern Virginia.

Typical pricing for Northern Virginia. All estimates are free and provided after an on-site visit.
| Project Type | Typical Cost | Notes |
|---|---|---|
| New residential driveway (per sq ft) | $7–$15/sq ft | Includes base, asphalt, apron |
| New commercial parking lot (per sq ft) | $2.50–$6/sq ft | Full base, asphalt, striping |
| Access road (per LF) | $35–$80/LF (12' wide) | Depends on base depth required |
| Multi-family parking deck prep | Call for quote | Site civil coordination required |
| VDOT driveway entrance / apron | $800–$3,500 | Includes ROW permit coordination |
| Phased paving (base coat now, surface later) | Split invoiced | Common on new residential builds |
We visit your property within 24–48 hours of your call, assess existing conditions, measure the scope, and give you a written itemized quote. No phone ballparks — we need to see the site to quote accurately and honestly.
Once you approve the quote, we schedule your job and handle any permit coordination. Most jobs are scheduled within 1–2 weeks. Commercial and HOA jobs can often be scheduled for overnight or weekend starts to minimize disruption.
Our crew arrives at the agreed time and completes the work with our own employees — no subcontracting. Most jobs are completed the same day. You receive a status update if anything changes the timeline.
Site cleanup before departure — all debris, equipment, and materials removed. Written aftercare instructions left at the job. We are available by phone after completion if you have questions about the surface or ongoing maintenance.
Arlington Elite Asphalt gives you an honest assessment — we never recommend the more expensive option when the simpler one will do.
Not sure if you need service now or can wait? These are the signs that indicate it's time to call Arlington Elite Asphalt at 571-427-0191.
New construction asphalt paving on undeveloped ground starts with subgrade — the native soil that will support everything above it. In Northern Virginia's clay-heavy soils, the subgrade must be evaluated for bearing capacity, moisture content, and stability before aggregate base is placed. Poor subgrade preparation is the single most common cause of new construction pavement failure within the first 5 years. We assess and document subgrade conditions before quoting base thickness.
A residential driveway supporting personal vehicles needs 4–6 inches of compacted aggregate base. A commercial parking lot supporting delivery trucks needs 8–10 inches. A loading dock or heavy equipment staging area needs 10–12 inches. The base specification is determined by soil bearing capacity and vehicle loads — not by what's standard for residential or commercial in the abstract. We use a soil probe and visual assessment to determine the correct base thickness for your specific project.
Proper drainage on new construction paving means establishing the finished grade before any asphalt is placed, then verifying that every point on the surface drains to an intended outlet: a road edge, a catch basin, a swale, or a drainage structure. Paving on a grade that traps water creates an immediate maintenance liability. We establish and verify drainage before any hot-mix is placed.
Asphalt paving is typically one of the last construction activities on a new project — after grading, utility installation, building construction, and landscaping rough-grade. Paving before other construction activities are complete risks damage to the new surface from construction traffic and equipment. We coordinate installation timing with your general contractor or site manager to sequence paving correctly.