Arlington Elite Asphalt installs new commercial parking lots throughout Arlington County and Northern Virginia — from small retail and office lots to large HOA community parking areas. We use 3–4 inch Superpave hot-mix asphalt over a 6–8 inch aggregate base, engineered for the vehicle loading and freeze-thaw conditions specific to the Northern Virginia region.
New parking lot installation runs $2.50–$6 per sq ft depending on lot size, base condition, and ADA requirements. Larger lots (above 10,000 sq ft) qualify for volume pricing. Striping included in all full installation quotes.
Arlington Elite Asphalt builds commercial parking lots that meet Virginia's commercial pavement specifications — proper drainage design, ADA-compliant slope and surface requirements, and heavy-duty base for 20+ year service life.

New parking lot installation pricing by lot size. Includes base, asphalt, and basic line striping.
| Lot Size | Typical Cost | Notes |
|---|---|---|
| Small lot (2,000–5,000 sq ft) | $7,000–$25,000 | Small retail, office, HOA entrances |
| Medium lot (5,000–15,000 sq ft) | $20,000–$75,000 | Volume pricing above 5,000 sq ft |
| Large lot (15,000–40,000 sq ft) | $55,000–$200,000 | Custom quote; phased paving available |
| ADA accessible spaces (each) | $500–$1,500 | Includes signage and markings |
| Lot striping (per space) | $4–$10 | Included in full install quotes |
| Stormwater coordination | Call for quote | Required for major lot redesigns |
We visit your property within 24–48 hours of your call. We assess existing conditions, measure the scope, and give you a written, itemized quote. No phone ballparks — we need to see the site to quote accurately.
Once you approve the quote, we schedule your job. Most jobs are scheduled within 1–2 weeks. We handle any permit coordination required — you don't file paperwork. Commercial jobs can often be scheduled for overnight or weekend starts.
Our crew arrives at the agreed time — no surprise schedule changes. Work is completed by our own employees, not subcontracted. Most jobs are finished the same day. You'll receive a status call if anything changes the timeline.
Site is cleaned before departure — debris, materials, and equipment all removed. Written aftercare instructions left at the job. We're available by phone after the job if you have questions about the surface or maintenance schedule.
Arlington Elite Asphalt gives you an honest assessment — we never recommend the more expensive option when the simpler one will do.
Not sure if you need service now or can wait? These are the signs that indicate it's time to call Arlington Elite Asphalt at 571-427-0191.
When interconnected fatigue cracking covers a significant portion of your parking lot, it signals base failure that has progressed past the point where sealcoating or crack sealing can stop it. At this stage, mill-and-overlay (removing the failed surface and replacing it) is typically more cost-effective than full-depth reconstruction — but only if the base itself is still structurally sound. We assess base condition with probe testing before recommending scope.
A pothole that returns within one to two seasons of patching is indicating ongoing base failure at that location. Cold-patch repairs fail because they don't bond to existing asphalt at depth the way hot-mix does, and if the base has eroded under the pothole, any patch will punch through. When potholes recur in the same locations, it's time for full-depth reconstruction of those areas — not more patching.
Virginia follows the 2010 ADA Standards, which specify maximum slope (2%), minimum dimensions, access aisle requirements, and signage specifications for accessible parking. Non-compliance creates legal liability for property owners. A new parking lot installation is an opportunity to ensure full ADA compliance from the start. Arlington Elite Asphalt designs ADA-compliant accessible space layouts and documents compliance for property records.
Standing water in a parking lot damages the base, creates liability from slip hazards, and signals grade deficiencies in the existing surface. During a full parking lot repaving, we have the opportunity to re-establish proper crown and drainage grades that move water off the surface efficiently. Re-grading a lot during overlay or reconstruction costs a fraction of what repeated base damage and liability exposure will cost over time.